Categories: Uncategorized

U.S. 221 Repairs Require Closure

NEWLAND, NC (May 22, 2018)…Department of Transportation crews have started clearing U.S. 221 in Avery County in preparation for repairs that will take at least two weeks to complete.

Heavy rains washed a short portion of the shoulder and road away from under the pavement northeast of Linville.

As a result, the U.S. 221 will remain closed until repairs are complete and engineers deem the area safe for motorists.

The marked detour takes drivers from Linville up N.C. 105 north to Boone, then down U.S. 321 South to Blowing Rock where drivers should take U.S. 221 South. The detour takes those starting east of the repairs up U.S. 221 to Blowing Rock, then to U.S. 321 North to N.C. 105 South to Linville.

Repairs will involve driving long soil-nails underneath the road and filling in the area with rocks and dirt before adding a wall and then asphalt on top. The work will cost an estimated $200,000.

Transportation officials remind motorists to follow detours, obey posted signs and drive slow through work zones.

For real-time travel information, visit DriveNC.gov or follow NCDOT on Twitter.

AddThis Website Tools
North Carolina Department of Transportation

Recent Posts

Caldwell Journal forced to close down

GRANITE FALLS, NC (December 19, 2024) ⇒ Due to the state of my health, I…

2 months ago

Merry Christmas…

GRANITE FALLS, NC (December 24, 2024) ⇒ Merry Christmas…

3 months ago

Merry Christmas Eve…

GRANITE FALLS, NC (December 24, 2024) ⇒ Merry Christmas Eve...

3 months ago

Extension Cord Safety Tips

GRANITE FALLS, NC (December 23, 2024) ⇒ Not enough cord for your lamp or radio…

3 months ago

A Christmas Of Long Ago

GRANITE FALLS, NC (December 22, 2024) ⇒ We are very blessed and honored to have…

3 months ago

Caldwell Journal forced to close down

GRANITE FALLS, NC (December 19, 2024) ⇒ Due to the state of my health, I…

3 months ago