Categories: News Archive

Blue Ridge Parkway Announces Road Closure from Milepost 402.7 to Milepost 408.4

ASHEVILLE, NC (October 24, 2017)…Several storm related closures are still in effect along the Blue Ridge Parkway. Parkway officials are asking for cooperation in particular at the closure from Milepost 402.7 to Milepost 408.4, where a significant washout was discovered along the road shoulder at the Little Pisgah Ridge Tunnel (Milepost 407). Park engineers are assessing the site for any additional undercutting of the road and needed repairs.

The Pisgah Inn and campground at Milepost 408.8 are accessible via US Route 276 which crosses the Parkway at Milepost 411.8.

Until repaired, this is a hazardous area and is closed to ALL traffic, including cyclists and hikers. Visitors behind closed gates will be asked to turn around. The public’s cooperation with this closure is important to personal safety as well as the protection of Parkway’s resources.

Updates regarding all closure areas will be posted on the Parkway’s online Real Time Road Map; other updates will also be posted regularly on the Parkway’s social media platforms, found using @BlueRidgeNPS.

Mark Jackson

Share
Published by
Mark Jackson

Recent Posts

Caldwell Journal forced to close down

GRANITE FALLS, NC (December 19, 2024) ⇒ Due to the state of my health, I…

12 months ago

Merry Christmas…

GRANITE FALLS, NC (December 24, 2024) ⇒ Merry Christmas…

12 months ago

Merry Christmas Eve…

GRANITE FALLS, NC (December 24, 2024) ⇒ Merry Christmas Eve...

12 months ago

Extension Cord Safety Tips

GRANITE FALLS, NC (December 23, 2024) ⇒ Not enough cord for your lamp or radio…

12 months ago

A Christmas Of Long Ago

GRANITE FALLS, NC (December 22, 2024) ⇒ We are very blessed and honored to have…

12 months ago

Caldwell Journal forced to close down

GRANITE FALLS, NC (December 19, 2024) ⇒ Due to the state of my health, I…

12 months ago